通信電纜 網絡設備 無線通信 云計算|大數據 顯示設備 存儲設備 網絡輔助設備 信號傳輸處理 多媒體設備 廣播系統 智慧城市管理系統 其它智慧基建產品
深圳市連訊達電子技術開發有限公司
梅凱Megger DET4T2系列DET4TD2|DET4TR2|DET4TC2|DET4TCR2絕緣電阻測試儀
梅凱Megger MIT300|MIT310|MIT310A|MIT320| MIT330絕緣電阻測試儀
梅凱Megger MIT400/2|MIT410/2|MIT420/2 |MIT430/2 四類絕緣測試儀
梅凱Megger MIT481/2 和 MIT485/2絕緣電阻測試儀
梅凱Megger MIT2500高壓手持式絕緣和連續性測試儀
梅凱Megger DLRO100E,DLRO100X及DLRO100H高度便攜微歐表100A
梅凱Megger MIT415/2 和 MIT417/2絕緣電阻測試儀
梅凱Megger MIT200|MIT210|MIT220|MIT230絕緣電阻測試儀
梅凱Megger MOM600A,MOM200A微歐計(回路電阻計)
梅凱Megger DET2/3高分辨率接地測試儀DET2/3RC
梅凱Megger DLRO10HDX低電阻微歐計DLRO10HD
梅凱Megger DET14C 和 DET24C接地電阻測試儀
梅凱Megger S1-1568直流絕緣電阻測試儀 15 kV
梅凱Megger S1-1068直流絕緣電阻測試儀S11068
EXFO光功率計PX1,PX1-PRO,PX1-S-PRO,PX1-H-PRO,PX1-S-PRO,PX1-H-PRO
EXFO FPM-600光功率計FPM-602 FPM-602X
EXFO FTBx-720C LAN/WAN接入網OTDR光時域反射儀
EXFO FTBx-730C PON FTTx/MDU OTDR光時域測試儀
EXFO FTBx-735C城域網/PON FTTx/MDU OTDR
EXFO MaxTester 720C - 接入網OTDR光時域反射儀
EXFO MaxTester 730C PON/城域網OTDR光時域反射儀
EXFO ELS-50光源ELS-50-23BL單模ELS-50-12C多模光源
EXFO FPM-300光功率計FPM-302,FPM-302X
EXFO FLS-300單多模光源FLS-300-12D,FLS-300-235BL
NetAlly TEST-ACC吞吐測試選件(iPerf服務器)TEST-ACC-5PK/TEST-ACC-10PK
NetAlly Aircheck G2無線網絡測試儀AIRCHECKG2-TA-KT
NetAlly LinkRunner 10G網絡測試儀LR10G-100|LR10G-100-KIT|EXG-LR10G-KIT
NetAlly LRAT-2000/LRAT-1000網絡測試儀LinkRunner AT(LRAT-2000-KIT)
NetAlly LinkRunner G2智能網絡測試儀LR-G2,LR-G2-KIT,LR-G2-ACKG2-CBO
NetAlly AirMagnet Wi-Fi Analyzer PRO無線分析儀(AM/A1150)
NetAlly EXG-200|EXG-200-KIT網絡測試儀EtherScope nXG
NetAlly LSPRNTR-300網絡測試儀LinkSprinter
NetAlly AirMagnet Survey PRO無線勘測儀WLAN分析工具(AM/A4018)
NetAlly AirMagnet Spectrum XT頻譜分析儀(AM/B4070|AM/A4040)
NetAlly 1TG2-3000/1TG2-1500網絡性能測試儀1T10G-1000
NetAlly EXG-200-KIT|EXG-200-KIT-2PK|EXG-200-LRG2-KIT|EXG-LR10G-KIT網絡測試儀EtherScope nXG
NetAlly AirCheck G3 Pro 第三代無線網絡測試分析儀
NETSCOUT 1TG2-3000-2PAK|1TG2-1500-2PAK|1T10G-1000-2PAK|網絡測試助手Onetouch AT G2
NETSCOUT LRAT-1000|LRAT-2000網絡測試儀LinkRunner AT
NETSCOUT AirMagnet Survey無線測試儀
NETSCOUT AirMagnet Spectrum XT無線頻譜分析儀
NETSCOUT LSPRNTR-300 網絡測試儀LinkSprinter
NETSCOUT AirMagnet WiFi Analyzer PRO無線網絡測試儀
NetAlly(NetScout) 1TG2-1500-LRAT2/1TG2-3000-LRAT2網絡測試儀
NETSCOUT 1TG2-1500|1TG2-3000|1T10G-1000網絡測試儀
NETSCOUT LR-G2|LR-G2-KIT智能網絡測試儀LinkRunner G2|LR-G2-LS-KIT報價 圖片 參數
暫無信息 |
閱讀:2發布時間:2024-12-27
Since the original IEEE 802.3af Type 1 power over Ethernet (PoE) standard that delivered up to 15.4 Watts (W) was first introduced in 2003, the technology has evolved to include Type 2 (up to 30 W), Type 3 (up to 60 W), and Type 4 (up to 90 W). That means PoE voltage now supports everything from phones, Wi-Fi access points, and surveillance cameras, to laptops, digital displays, and even facility-wide LED lighting—all requiring various levels of PoE power.
To help manage PoE requirements, IEEE also assigns classes to PoE systems that range from 0 to 8. Type 1 and Type 2 PoE encompass Class 0 through Class 4 (4–40 W), Type 3 includes Class 5 (45 W) and Class 6 (60 W), and Type 4 includes Class 7 (75 W) and Class 8 (90 W). That essentially means you could have 8 different classes of PoE devices supported by a single PoE switch or other power sourcing equipment (PSE). And when one of those devices isn’t getting power, you need the ability to troubleshoot it.
PoE Not Working?
There are a variety of reasons why a PoE device might not be working. Lack of continuity due to poor terminations such as opens, shorts, and miswirings, as well of cable damage along a link, can obviously prevent any signal—data or PoE—from transmitting. Increased insertion loss due to heat rise or poor DC resistance unbalance performance can also be a culprit, as well as a device that is not compliant with IEEE PoE standards. When a link has passed certification testing, you have verified continuity, and a standards-compliant PoE device is still not receiving power, the problem could be the active power sourcing equipment (PSE).
On a PoE-enabled switch, the amount of PoE power is allocated per port based on the requirements of its connected device. Allocation allows the switch to supply power with greater efficiency. For example, a typical 24-port PoE-enabled switch may have a power budget of 740 W for powered devices, enabling up to 30 W (Type 2) on each port. With such a wide variety of PoE devices now residing on the network, it’s pretty much guaranteed that not every connected device will require the full 30 W from the switch—you could have a VoIP phone requiring just 7 W of PoE power from one switch port and surveillance camera requiring 15.4 W on another switch port.
Through allocation, the amount of PoE power delivered on a specific port can be reduced. By the same token, PoE power can be increased on a port to support a device that requires more power. The basic rule of thumb is: for a connected device to receive an adequate level of power to operate, the PoE power delivered via the PSE must be equal to or greater than the class of its connected device. For that to happen for all devices connected to the PSE, the total power required for all the devices cannot exceed the total power budget of the PSE.
While today’s advanced PoE switches can determine power requirements of connected devices via power-negotiation messages and allocate power appropriately, problems can arise when that communication malfunctions, PoE has been manually (and incorrectly) allocated per port, the overall power budget of the switch has been oversubscribed, or the equipment can’t support the device requirements. And that calls for more advanced troubleshooting.
How to Check PoE on a Switch Port
Network switches use standards-based link layer discovery protocol (LLDP) or Cisco discovery protocol (CDP) that allow them to discover connected devices and advertise their capabilities. These protocols can be used to acquire information about a switch and a specific port, including port ID, VLAN, advertised speeds, and PoE. Fluke Networks LinkIQ Cable + Network Tester has the ability to receive discovery protocol packets from a switch for a given link and place a load on the connection to ensure that the advertised power is actually what is being delivered across the cabling to the device. This is referred to as PoE load testing.
As a PoE load tester, LinkIQ shows which pairs of a four-pair network cable are carrying power, the negotiated power class (0-8) and the loaded power in watts provided by the PSE at the device. It also shows the minimum required volts that the device needs to meet under load based on the negotiated power class and the actual measured volts under load to ensure it meets that requirement. Because power negotiation between the PSE and PD occurs both at the hardware and software levels to ensure that a device has the capability to connect to the network and to allow for dynamic allocation by the PoE switch, LinkIQ shows this information for both the hardware and software class. A PoE device fails testing with LinkIQ if its negotiated hardware or software class is greater than the power the PSE can deliver. It also fails if the PSE cannot deliver power to the device because the maximum power which the switch can deliver is already in use—in other words, the power has been oversubscribed.
LinkIQ shows you how to check if a switch is PoE enabled and even indicates if the switch can negotiate single signature power or dual signature power. A single-signature device maintains the same power signature across both pair sets (pairs 1,2 and 3,6 and pairs 4,5 and 7,8) while a dual-signature device can have independent power signatures on each pair set, either 1,2 and 3,6 (Dual A) or 4,5 and 7,8 (Dual B). This information is useful because IEEE 802.3bt (Type 3 and Type 4) supports both topologies, and if your switch only supports single-signature devices, it may need to be updated to support dual-signature 802.3 bt devices.
While certification testing will tell you if an installed cabling plant will support PoE and simple wiremap testers will identify continuity issues, once active devices are installed, Fluke Networks LinkIQ with its switch negotiation and PoE load testing capabilities is ideal for more advanced PoE testing.
智慧城市網 設計制作,未經允許翻錄必究 .? ? ?
請輸入賬號
請輸入密碼
請輸驗證碼
請輸入你感興趣的產品
請簡單描述您的需求
請選擇省份